URL: http://www.cemecon.de/e4375/e4897/e5023/index_eng.html


CemeCon Coating competence 2. Construction of your individual coating 2.3 Sampling / Evaluation

Step 3: Sampling Inspection / Evaluation

Creation of sample tools monitored and documented by CemeCon engineers

Once the selection of the individual production steps has been completed, we produce the initial sample tools in accordance with this preliminary specification.


In doing so, we document:

Use of these test tools can be monitored and documented by CemeCon engineers. They also check the extent to which results match the objectives and whether optimization is necessary.



Copyright © 2012 CemeCon AG Germany All Rights Reserved